Description
Facility-side cooling (primary loop, chilled water, valves and energy meters, dew-point margin) is usually out of scope at first and integrated later through the building management system, typically over BACnet/IP or MQTT; NVIDIA’s own BMS integration path is MQTT-based. Before modelling anything, the real collection path into Grafana Cloud and its signal source need confirming.
Acceptance Criteria
- #1 A written finding names a real collection path from BMS protocols into Grafana Cloud and the signal source for its names, or rejects the work with the missing material named
- #2 The spike emits no telemetry and changes no production source
Definition of Done
- #1 just check (fmt-check, lint, gen-check, env-check, docs-check, test, race, hygiene, ui-check, compose-check, helm-test, lab-check, signal-fidelity)
- #2 just gen (only if a blueprint field, construct/workload config struct, or a skill under plugins/synthkit/skills/ changed)
- #3 just dump — inventory diffed against signals/