Task · GCI-0131

Start DNS caller deadline after pool warm-up in phase proof

Description

loop20 composed gate b2b6477 fails DNS-entry assertion because ReadOnlyClient deadline starts before pool warm-up, whereas test wall clock starts after. Triage reproduced isolated pass but traced pre-DNS expiration from unchanged setup; no transport regression observed. Existing completed DNS phase task did not eliminate caller deadline consumption during setup. Release blocks on true composed proof, never a flaky retry substitute.

Acceptance Criteria

Definition of Done

Implementation Plan

Repair tests/test_netbound.py only, reproduce delayed setup at process edge, preserve phase assertions/time bounds; gate/review and land; composed gate then release resumes.

Implementation Notes

loop20:1 implementation attempt,0 review-repair rounds; accepted804063596dc244aec4f7cb0cf07de1cc4ebd07ce. Deterministic delayed warm-up old proof fails DNS entry, repaired twelve modes/phases and16 focused tests pass. All deadlines/assertions unchanged. CodeRabbit complete major0; preexisting backlog-path minor not changed. Independent review PASS; composed just check2611passed2existing skips/tofu37 exit0; exact CI37962580200 all jobs success. No production change.

Final Summary

Separated pool warm-up from DNS caller deadline without changing proof bounds; exact composed gate and CI passed.

References

View the source file on GitHub