Task · CFO-0076

Update Durable Objects resource-dimension budget fixture

Description

Loop16 source review found an optional-field-budget fixture still advertises namespaceName while production correctly selects namespaceId. Existing checkpoint and MAX assertions pass, but this fixture no longer demonstrates exclusion of the new dimension under a tight field budget. This is a test coverage gap, not an observed production defect.

Acceptance Criteria

Definition of Done

Implementation Plan

Loop17 frozen packet: one local implementation attempt with assertion-red witness, just check and CodeRabbit to terminal result; fresh exact-SHA independent REV before root linear landing. No lane remote writes.

Implementation Notes

Loop17 fresh REV-FIX-PLAT found no code defect and supports namespaceId tight-budget fixture/checkpoint/MAX/no-identifier evidence, but combined candidate blocked by separate CFO-0077 missing red witness. Root review-repair RR1 of3 admits same-branch narrow withdrawal of both D1 hardening edits, retaining only Durable Objects fixture patch; no gate or criterion relaxed, fresh REV on new full SHA required.

Final Summary

Durable Objects tight-field-budget fixture advertises current namespaceId and proves exclusion under the two-field budget, preserving checkpoint/MAX14/no-identifier assertions. Fixture-only base tests green explicitly not called product red. Fresh REV-FIX-PLAT-RR1 PASSbfefab20fba6ed227d0e566d60ae84d213fbb304; exact patch/history landed87b845c/be8c345, D1 hardening restored byte-identicalbase and CFO0077 remainsparked. Integrated gate/scans green and pushed061690dcd59effbbdfe0cc116025361ba8b39488, landing CI pending. No image/packaging or new signal obligation applies.

View the source file on GitHub